Preparation for the Cyrus 2.5 release

Bron Gondwana brong at fastmail.fm
Fri Oct 24 23:45:24 EDT 2014


On Thu, Oct 23, 2014, at 05:13 AM, Ondřej Surý wrote:
> Hi Bron,
> 
> On Wed, Oct 22, 2014, at 22:53, Bron Gondwana wrote:
> > Our goal is to release a pretty-much feature complete alpha this week,
> > and ask everyone to test it soon.  We would like to have 2.5 ready for
> > inclusion in Debian Jessie, hence the time pressure.
> 
> the Debian Jessie freeze is going to happen on November 5th[1] and the
> migration time from unstable to testing is now 10 days.
> 
> That basically means unless you have a final 2.5 (or at least some
> RC[2]) at the end of the week (26th October), it's not going to be
> included in Jessie. 

Realistically, not going to happen.  I'm not happy with the sync code yet.

> I don't see that as a big problem, since we can easily provide a 2.5 in
> debian-backports and the Ken's version I have in unstable seems to be
> pretty stable.

Awesome.  Let's do backports for 2.5 then.  There's a LOT of changes from 2.4, and I'd prefer not to screw people.

> 1. https://release.debian.org/jessie/freeze_policy.html
> 2. I can push smaller changes via stable-package-update, but that means
> those changes needs to be small and isolated enough.

Yeah, not worth it.  I'd rather give it a bit longer to be right.

Bron.

-- 
  Bron Gondwana
  brong at fastmail.fm


More information about the Cyrus-devel mailing list